Building project review

Congratulations on completing your building project.
Thank you for reviewing your builder.
At BuildAdvisor we ensure that …

  • Reviews are fair

  • Reviews are simple and easy to complete.  All questions are multiple choice.

  • Reviews are private

  • You can choose to review anonymously.  To protect your privacy, only the project suburb is made public.

  • Reviews are real

  • We require your building permit number and the address of the building to verify your project.
    Also, we require your contact details so we can verify your identity.
    At BuildAdvisor protecting your data is our highest priority, so we never share data with third parties.

Test post #1

Head 1

Subheading (H2)

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’, making it look like readable English.

Subheading (H3)

Many desktop publishing packages and web page editors now use Lorem Ipsum as their default model text, and a search for ‘lorem ipsum’ will uncover many web sites still in their infancy. There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form, by injected humour, or randomised words which don’t look even slightly believable.


On The Spot Fines 2018

2018 building regulations new & existing fines

The new building regulations are to be implemented on the 2nd of June. A number of offences have been added to the regulator.

The new regulations are designed to give transparency and information to the regulator, the general public and building owners. They also aim to improve fire safety in multi-storey residential buildings.

New Fines

The builder named on the building permit must ensure that a copy of the building permit documents are on site (VBA 2018).

$320 Offence.

 

WHAT YOU MUST SHOW TO THE PUBLIC

 

Before commencement of the building a permit must be displayed to the public This includes demolition, or the removal of a building.

The details must include your registration number, contact details and the details of the building surveyor. You must also include the permit number and the date of issue of the permit.

 

This information must remain legible and visible for the duration of the work.

 

WHAT DOCUMENTS YOU NEED FOR INSPECTION

 

Within 7 days after you’ve received the building permit the building surveyor must provide you

 

  • A copy of the permit.
  • 2 copies of plans, specifications, and any other documents(excluding computations and reports).

An owner of a building or place must ensure that a copy of the current occupancy permit is displayed and at an approved location on site (VBA 2018).

 

$320 for a building, $790 for a place

 

This regulation applies to class 1b, 2, 3, 5 , 6 7 and 8 building constructed on or after 1 July 1994. It also applies to class 9 buildings and places of entertainment.

 

The building owner must keep the permit at the approved location of the building surveyor.

 

The building surveyor must choose a location that is prominent and accessible to the public. There are rare exclusions in (281) of the building act.

 

The owner of a building or place must give the RBS working on a maintenance schedule, all prescribed documents within 7 days after the RBS requests them.

 

$320 for a building, $790 for a place

 

The owner of the building must provide the relevant surveyor all the relevant documents including:

 

  • All annual safety measure reports under the 2018 regulations or previous.
  • All maintenance schedules in relation to essential safety measures at the site.
  • All maintenance determinations requiring an essential safety measure.
  • The records of all inspections, testing and maintenances of any essential safety measure at the place or building.